This Teaching Learning Critical Pathway (TLCP) is specifically designed for Grades 5 and 6 respectively. The focus of the TLCP is Social Justice and specifically focused on Black History in North America. The focus for Grade 5 is Immigration and Citizenship and for Grade 6 is Perspective in Writing (from the vantage of fictional and historical non-fiction writings). Language, Math, Information Technology and The Arts will be integrated into these two foci.